Showing posts with label ship repair facility. Show all posts
Showing posts with label ship repair facility. Show all posts

Friday, September 29, 2017

Shipyard for Lease

By Karen Robes Meeks

The Port of San Francisco is in the midst of finding bidders to lease a 14.7-acre ship repair facility and its equipment that is being upgraded.

The shipyard features 16 buildings and 17.4 acres of submerged lands with tenant-controlled access, as well as floating Dry Dock #2, floating Dry Dock Eureka, shore power capability and other port-owned assets.

Improvements have been made to the site, with more on the way, including a newer electrical system and power grid separation project, a new 19th Street extension near Illinois Street, and the removal of two run-down buildings. All three projects are expected to be completed by April 2018.

There are also plans to dredge at Dry Dock #2 and Wharf 4 East, as well as a “close-to-final project partnership agreement” with the U.S. Army Corps of Engineers to keep dredging the Central Basin, the shipyard’s access point.