So many empty Hanjin Shipping cargo containers have piled up at Southern California ports since Hanjin filed for bankruptcy protection a little over two months ago that an entire containership is being enlisted to clean up the mess.
The Port of Long Beach and terminal operator Total Terminals International said Nov. 3 that they’ve reached an agreement to help clear the significant backlog of empty cargo containers from Southern California and free up the chassis they sit on.
As part of the agreement, a container ship is being brought in to remove up to 4,300 empty containers.
Hanjin Shipping filed for bankruptcy protection on Aug. 31, resulting in a significant buildup of empty containers across Southern California, tying up the chassis they rest on. To alleviate the problem, Long Beach and TTI have worked together to secure an empty vessel to reposition the containers, a solution that will help move empty containers back to Asia and bring significant relief to the inventory of the truck trailers onto which containers are mounted, explained Dr. Noel Hacegaba, the Port of Long Beach’s Managing Director of Commercial Operations and Chief Commercial Officer.
The empty container ship is expected to arrive in Long Beach within the coming week.
“TTI has already begun accepting empty Hanjin containers from container-leasing companies, freeing up every chassis that drops off a container,” Hacegaba said. “We expect that as many as 3,000 containers will literally be taken off the street and shipped back to Asia, with another 1,300 being removed from the port, putting thousands of chassis back to work.”
TTI is loading the ship at cost, while the Port of Long Beach will waive its fee for access to the Port’s terminal.
“We feel this is a fair and necessary accommodation to keep goods moving through the ports in Southern California and to ensure our customers are able to remove their containers,” Hacegaba said.
TTI Long Beach said it will receive specific Hanjin-leased empty containers authorized by four leasing companies: Triton, Textainer, Seacube and Florens. Delivery instructions can be found at www.ttilgb.com.
Showing posts with label TTI. Show all posts
Showing posts with label TTI. Show all posts
Tuesday, November 8, 2016
Friday, July 26, 2013
Settled Litigation Clears Way for Oakland Mega-Terminal
The Port of
Oakland has approved a litigation settlement agreement with SSA Terminals
(SSAT) that paves the way for the creation of what could become the third
largest container terminal on the West Coast.
The
settlement, which SSAT revealed July 18, involves four of the port’s seven
marine terminals, all of which are along Oakland’s Inner and Middle Harbors:
Howard Terminal at Berths 67-68; Global Gateway Central (GGC) terminal at
Berths 60-63; Oakland International Container Terminal (OICT), inhabiting
Berths 57-59; and Total Terminals International (TTI) terminal at Berths 55-56.
Under the
settlement, SSAT will lease Berths 57-59 and Berths 60-63 terminals through
2022 at current rates and conditions; terminate its lease for Howard Terminal
effective Sept. 30, 2013; and dismiss current litigation against the port.
Additionally,
and independent of the settlement agreement, the TTI lease will be assigned to
SSAT through 2016, with an option to extend to 2022.
SSAT had sued
the Port of Oakland in 2009, accusing the port of violating the Federal
Shipping Act of 1984 by signing a 50-year lease deal with Ports America. Under the
deal, the Port of Oakland had agreed to turn over operation of some of its terminals
to a private investor in exchange for $686 million.
Settlement
talks between the port and SSAT began in 2012 and were concluded with the July
18, 2013 announcement. Prior to the settlement, the port had been facing the
expiration of all four terminal leases along its middle and inner harbors in
2016-2017.
The contracts
also had very short renewal notification periods, which left the port
vulnerable in the event one of the operators decided not to renew its lease.
The
settlement and the independent assignment of the TTI terminal lease now allows
SSAT to move forward with the creation of the proposed 350-acre mega-terminal,
which would be the largest in Northern California.
“These
terminal expansions are a prerequisite to remain viable to our customers and
for them to continue to retain Oakland as a port of call,” SSA Terminals Vice
President Jon Rosselle said. “It also further enhances the logistics chain for
exporters and importers in the local region and well beyond.”
The port says
agreement also provides Oakland with important competitive benefits that would
facilitate the efficient flow of cargo through the terminals.
“We reached
this litigation settlement to protect the port’s long-term viability as a
job-creating economic engine for this region,” port Board President Ces Butner said.
“This is a fair deal and creates a lease in line with current market realities.”
Labels:
GGC,
OICT,
Port of Oakland,
SSA Terminals,
TTI
Tuesday, May 14, 2013
Public Hearing on Grain Export Facility Set
The Port of Long Beach is conducting a public hearing June 5 at City Hall regarding a proposed grain export facility at Pier T on Terminal Island.
The port has released a recirculated draft Environmental Impact Report examining the proposed Total Terminals International grain export facility at Pier T; the public hearing will be to gather comments on the recirculated draft EIR.
TTI’s proposal is for a grain export facility that would enable the transfer of grain and a grain product known as dried distillers grains with solubles from railcars to ocean shipping containers. Both products would be used for cattle feed only, according to the port.
The facility could capitalize on the existing rail facilities and container yard to receive grain and dried distillers grains for export, with a capacity range of 750,000 to 2.8 million tons per year. It would be built on 11.6 vacant acres adjacent to the current TTI container shipping terminal.
A draft EIR was issued last year, but changes to the proposal required that a recirculated draft EIR be developed and circulated. The public hearing is scheduled for 6:30 p.m. Wed., June 5, 2013, at Long Beach City Hall Council Chambers, 333 W. Ocean Blvd., Long Beach, 90802. Parking is available in a structure off Broadway between Chestnut and Cedar avenues.
The recirculated draft EIR is available at http://www.polb.com/ceqa.
Written comments can be sent to Richard D. Cameron, Director of Environmental Planning, Port of Long Beach, 925 Harbor Plaza, Long Beach, CA 90802 or e-mailed to Cameron@polb.com.
The port has released a recirculated draft Environmental Impact Report examining the proposed Total Terminals International grain export facility at Pier T; the public hearing will be to gather comments on the recirculated draft EIR.
TTI’s proposal is for a grain export facility that would enable the transfer of grain and a grain product known as dried distillers grains with solubles from railcars to ocean shipping containers. Both products would be used for cattle feed only, according to the port.
The facility could capitalize on the existing rail facilities and container yard to receive grain and dried distillers grains for export, with a capacity range of 750,000 to 2.8 million tons per year. It would be built on 11.6 vacant acres adjacent to the current TTI container shipping terminal.
A draft EIR was issued last year, but changes to the proposal required that a recirculated draft EIR be developed and circulated. The public hearing is scheduled for 6:30 p.m. Wed., June 5, 2013, at Long Beach City Hall Council Chambers, 333 W. Ocean Blvd., Long Beach, 90802. Parking is available in a structure off Broadway between Chestnut and Cedar avenues.
The recirculated draft EIR is available at http://www.polb.com/ceqa.
Written comments can be sent to Richard D. Cameron, Director of Environmental Planning, Port of Long Beach, 925 Harbor Plaza, Long Beach, CA 90802 or e-mailed to Cameron@polb.com.
Labels:
grain export,
Port of Long Beach,
TTI
Tuesday, December 18, 2012
Hanjin/TTI’s Port of Seattle Lease Extended
The Port of Seattle Commission has approved a 10-year lease
extension with Total Terminals International that’s expected to secure
continued volume and revenue at the port’s Terminal 46 through 2025.
“We worked very hard to keep TTI in the Port of Seattle,” Port
Commission President Gael Tarleton said of the extension, which was approved
Dec. 11. “The cargo handled at T-46 means thousands of jobs and economic
benefit for our region.”
Terminal 46 generates about 20 percent of the container
cargo currently passing through the port. Cargo volumes at the terminal are
estimated to generate 3200 direct, induced and indirect jobs annually. In
addition, current activities at the terminal are estimated to annually generate
over $370 million in business revenue and over $24 million in state and local
taxes.
Tenant TTI is a joint venture subsidiary of Hanjin Shipping
and Terminal Investment Limited. South Korea-based Hanjin Shipping has been
operating in Seattle harbor since 1981 and has been at Terminal 46 since 1986.
“Hanjin Shipping and (the) Port of Seattle have been working
together since 1986 and we hope our partnership will last in harmony and mutual
growth,” Hanjin Vice President and shipping manager Tae-Hoon Kim said in a
prepared statement.
Labels:
Hanjin Shipping,
Port of Seattle,
Terminal 46,
TTI
Tuesday, December 13, 2011
Port of Long Beach Releases Grain Export Study
The Port of Long Beach on Dec. 9 released a draft environmental impact report on a proposal to build a grain export facility at Terminal Island’s Pier T.
The proposed Total Terminals International facility would transfer grain from railcars into ocean shipping containers and export from 750,000 to 1.5 million tons of grain per year utilizing existing rail and container shipping facilities.
The proposal includes installation of a grain transloading facility on a vacant 10-acre parcel on Pier T adjacent to the existing 385-acre TTI container terminal. The proposed project would be located on the former Navy Mole, a 2-mile-long, 500-foot-wide peninsula that wraps around Long Beach Harbor’s west basin.
Existing rail lines follow the southern edge of the site and connect to other rail lines including the BNSF and the Union Pacific networks.
TTI says the project would enable the transfer of a high quality feed for cattle utilizing the existing rail and shipping infrastructure. Under the proposal, the same frequency of shipping vessels would occur, but the containers would instead transport grain to China.
Shipping vessels currently transport empty containers from Pier T.
Construction of the facility would last about 14 months, from June 2012 through July 2013.
The port hosts a public hearing to solicit comments on the document at 7 p.m. Jan. 11 at Long Beach City Hall Council Chambers, and written comments are being accepted by the port through Jan. 23. The draft document is available at polb.com/ceqa.
The proposed Total Terminals International facility would transfer grain from railcars into ocean shipping containers and export from 750,000 to 1.5 million tons of grain per year utilizing existing rail and container shipping facilities.
The proposal includes installation of a grain transloading facility on a vacant 10-acre parcel on Pier T adjacent to the existing 385-acre TTI container terminal. The proposed project would be located on the former Navy Mole, a 2-mile-long, 500-foot-wide peninsula that wraps around Long Beach Harbor’s west basin.
Existing rail lines follow the southern edge of the site and connect to other rail lines including the BNSF and the Union Pacific networks.
TTI says the project would enable the transfer of a high quality feed for cattle utilizing the existing rail and shipping infrastructure. Under the proposal, the same frequency of shipping vessels would occur, but the containers would instead transport grain to China.
Shipping vessels currently transport empty containers from Pier T.
Construction of the facility would last about 14 months, from June 2012 through July 2013.
The port hosts a public hearing to solicit comments on the document at 7 p.m. Jan. 11 at Long Beach City Hall Council Chambers, and written comments are being accepted by the port through Jan. 23. The draft document is available at polb.com/ceqa.
Labels:
Pier T,
Port of Long Beach,
Terminal Island,
TTI