Showing posts with label SSA Terminals. Show all posts
Showing posts with label SSA Terminals. Show all posts

Friday, March 29, 2019

Oakland Terminal Moving to Hybrid Yard Cranes

By Karen Robes Meeks

The largest marine terminal at the Port of Oakland is transforming 13 diesel-powered yard cranes to hybrid power, a move that is anticipated to lower diesel-related air pollutants by 45 tons annually.

Oakland International Container Terminal, which introduced its first hybrid crane earlier this month, expects the retrofitted fleet will come online by 2020.

Each retrofitted crane will feature batteries and new, smaller diesel backup engines.

“This is the Prius of cargo-handling equipment,” said Port of Oakland Environmental Planner Catherine Mukai. “We’re gratified that our partners at the terminal are taking this step to help clear the air.”

Last summer, terminal operator SSA Terminals secured a $5 million grant from the Bay Area Air Quality Management District for the hybrid project and is spending an additional $1 million to reconfigure its cranes.

“We depend heavily on this equipment to keep cargo flowing smoothly,” said Jim Rice, General Manager at Oakland International Container Terminal. “We’re pleased to find a solution that makes us more efficient and at the same time benefits the environment.”

Friday, June 29, 2018

SSA in Oakland Upgrading to Hybrid RTGs

By Karen Robes Meeks

SSA Terminals – the Port of Oakland’s largest marine terminal operator –announced it will spend more than $6 million to modernize 13 diesel-powered rubber tired gantry (RTG) cranes with diesel-electric hybrid engines; a move that could potentially curb more than 45 tons of exhaust emissions a year at the port.

Most of the funding will come from a $5.1 million Community Health Protection Grant Program/Carl Moyer Program grant that was approved earlier this month by the Bay Area Air Quality Management District.

“We’re delighted that SSA is taking a lead role in curbing emissions,” said Port of Oakland Maritime Director John Driscoll. “And we’re grateful that their initiative has the support of the Air District.”

SSA must finalize a contract with the Air District before starting the work. According to the port, the retrofit project could take up to two years to complete.

Tuesday, June 26, 2018

SSA Renews Oakland Lease

By Karen Robes Meeks

SSA Terminals and the Port of Oakland have agreed on a new lease that runs through 2027, with options to extend to 2042, the port announced earlier this month.

The deal also includes plans for a 19-acre expansion at SSA’s Oakland International Container Terminal (OICT) and the acquisition of three new ship-to-shore cranes by the terminal operator for cargo handling.

“SSA is an influential player on the waterfront worldwide and a significant presence in Oakland,” said Port Maritime Director John Driscoll. “This lease commitment demonstrates its belief in the port’s long-term prospects.”

SSA – which also runs Oakland’s Matson Terminal – is the largest marine terminal operator in Oakland, handling about 60 percent of the port’s containerized cargo.

“We see steady cargo growth for Oakland into the next decade,” said Ed DeNike, president of SSA Containers. “This new lease helps us plan for the future.”

Friday, April 7, 2017

SSA to Manage Matson’s Tacoma Terminal

By Mark Edward Nero

On April 4, Matson Inc. announced that its US Pacific carrier subsidiary Matson Navigation Co. will use SSA Terminals (SSAT) for stevedoring and terminal services at the Port of Tacoma when its existing agreement with APM Terminals expires on December 31.

“APMT has served us well. It just makes more sense to work with our strategic partner at Tacoma as we do at all of our other terminals on the West Coast,” Ron Forest, senior vice president of operations for Matson explained in a statement.

Tacoma is the only Matson terminal on the US West Coast not currently handled by SSAT.

The terminal, with 12 employees, became part of the Maersk Group portfolio in 2000 with Maersk Line’s acquisition of US-based Sea-Land Service. The facility, with an annual throughput capacity of 600,000 TEU, was used primarily by the Matson Alaska Service, with twice-weekly sailings between Tacoma, Anchorage and Kodiak, and a weekly service between Tacoma and Dutch Harbor, handling about 190,000 TEUs in 2016.

“We expect a seamless transition and no change in our Tacoma operations from a customer standpoint,” Forest said. In a statement, APM Terminals said it is “evaluating all options” regarding the terminal lease with Matson that expires at the end of the year.

Friday, March 13, 2015

Labor Dispute Closes Oakland’s SSA Terminal

By Mark Edward Nero

Just days after the Port of Oakland declared that it was making significant progress on clearing a cargo backlog that built up during months of labor unrest, operations at a container terminal came to a halt on March 11 due to labor issues.

According to the port and the International Longshore & Warehouse Union, yard and gate operations at Oakland International Container Terminal, which is operated by SSA Terminals, were ceased around 10:30 am Wednesday morning due to a dispute.

SSA Terminals said that it has dismissed longshore workers after they refused to work due to a dispute over staffing levels. The ILWU claims that 45 dockworkers were fired and sent home.

In a statement issued on SSA’s behalf, the Pacific Maritime Association said the incident was caused by the ILWU local refusing to adhere to standard operating protocol.

“The terminal in question follows standard industry practice of hiring two workers for every yard crane – the same as at every other terminal at the port,” the statement reads in part. “Yet, ILWU Local 10 is refusing to allow yard cranes to operate unless that number is increased to three.”

The PMA’s statement also says that the three-person demand was something that Local 10 made, but then dropped during the nine months of negotiations between the union and PMA that ended in February with a tentative five-year contract for workers and management at 29 West Coast seaports.

The Maritime Association claims Local 10 has also refused to allow longshore utility workers to lock and unlock connecting devices between chassis and containers, something that the PMA calls a “longstanding practice at every terminal in the port.”

All marine terminals were open and active as of 8 am on March 12, according to the port.

On March 6, the Port of Oakland touted its success in reducing a cargo backlog caused in part by the nine months of labor unrest, saying that signs of progress included a declining vessel backup; decongested terminals; improved transaction times; and better terminal productivity.

Tuesday, July 29, 2014

Protesters Plan Oakland Ship Blockade

By Mark Edward Nero

A group of activists say they plan to prevent two ships from docking at the Port of Oakland on Aug. 2 in order to send a political message to Israel.

According to a Facebook page for the “Block the Boat for Gaza” event, protesters plan to meet around 5:30 a.m. at the Port of Oakland and block two Zim Integrated Shipping commercial vessels at Berth 57, which is run by SSA Terminals. Zim, Israel’s biggest cargo shipping company, is 32 percent owned by the country’s government.

According to Zim, the Liberia-flagged Zim Savannah and German-flagged Ever Conquest are the two container ships slated to arrive at the port Aug. 2 and within 24 hours set sail for China.

The protest organizers, which include the Bay Area Labor Committee for Peace & Justice, say the blockade is being conducted in solidarity with Palestinians living in the Gaza Strip who are directly affected by a recent wave of violence in the region.

“We need to send a clear message that we don't want Israel Corp, or its subsidiary Zim Shipping in our port,” a statement on the event’s Facebook page says in part.

Organizers say that the International Longshore & Warehouse Union has not endorsed the blockade and is not expected to take part, but that the protesters have been communicating with the union to keep it informed about its plans.

Friday, July 26, 2013

Settled Litigation Clears Way for Oakland Mega-Terminal

The Port of Oakland has approved a litigation settlement agreement with SSA Terminals (SSAT) that paves the way for the creation of what could become the third largest container terminal on the West Coast.

The settlement, which SSAT revealed July 18, involves four of the port’s seven marine terminals, all of which are along Oakland’s Inner and Middle Harbors: Howard Terminal at Berths 67-68; Global Gateway Central (GGC) terminal at Berths 60-63; Oakland International Container Terminal (OICT), inhabiting Berths 57-59; and Total Terminals International (TTI) terminal at Berths 55-56.

Under the settlement, SSAT will lease Berths 57-59 and Berths 60-63 terminals through 2022 at current rates and conditions; terminate its lease for Howard Terminal effective Sept. 30, 2013; and dismiss current litigation against the port.

Additionally, and independent of the settlement agreement, the TTI lease will be assigned to SSAT through 2016, with an option to extend to 2022.

SSAT had sued the Port of Oakland in 2009, accusing the port of violating the Federal Shipping Act of 1984 by signing a 50-year lease deal with Ports America. Under the deal, the Port of Oakland had agreed to turn over operation of some of its terminals to a private investor in exchange for $686 million.

Settlement talks between the port and SSAT began in 2012 and were concluded with the July 18, 2013 announcement. Prior to the settlement, the port had been facing the expiration of all four terminal leases along its middle and inner harbors in 2016-2017.

The contracts also had very short renewal notification periods, which left the port vulnerable in the event one of the operators decided not to renew its lease.

The settlement and the independent assignment of the TTI terminal lease now allows SSAT to move forward with the creation of the proposed 350-acre mega-terminal, which would be the largest in Northern California.

“These terminal expansions are a prerequisite to remain viable to our customers and for them to continue to retain Oakland as a port of call,” SSA Terminals Vice President Jon Rosselle said. “It also further enhances the logistics chain for exporters and importers in the local region and well beyond.”

The port says agreement also provides Oakland with important competitive benefits that would facilitate the efficient flow of cargo through the terminals.

“We reached this litigation settlement to protect the port’s long-term viability as a job-creating economic engine for this region,” port Board President Ces Butner said. “This is a fair deal and creates a lease in line with current market realities.”


Friday, July 27, 2012

Seattle Terminal Receives More Super Post-Panamax Cranes


SSA Terminals, which operates the Port of Seattle’s 196-acre Terminal 18, has received a shipment of three 267-foot Super Post-Panamax cranes from China, doubling the number at the terminal.

“We made this investment to continue Terminal 18 as the best destination in the Pacific Northwest for the world’s most modern and efficient ships,” SSA Marine CEO Jon Hemingway said. “No other terminal in the region comes close to Terminal 18’s size, draft and cranes, or T18’s ample on dock and nearby rail connectivity.”

The cranes, each of which a lifting height of 146 feet and an outreach of 210 feet, were made by Chinese equipment manufacturer ZPMG and delivered to the port July 24 on the ship Zhenhua 23.
As some of the largest container handling cranes in the world, they can extend out to handle the new Triple E Class vessels, which can carry up to 18,000 TEUs with a width of 210 feet, or 24 containers. The cranes can lift containers weighing up to 65 tons, according to the manufacturer.

“SSA is making Terminal 18 big-ship ready for the next generation of ocean-going vessels,” Port Commission President Gael Tarleton said in a statement announcing the arrivals.

Together with the three Super Post-Panamax cranes that arrived in December 2011, the cranes represent a $54 million investment by SSA, according to the company.

Tuesday, November 29, 2011

Three Super-Sized Cranes Arrive in Seattle

The Port of Seattle has become the new home for three “Super Post-Panamax” container cranes.

The cranes, which are made to handle the largest vessels now in existence, were brought through Elliott Bay on Nov. 28, and are expected to allow the port to expand the reach of unloading container ships to the 24 container width maximum.

They were built in Shanghai, China and transported to the Pacific Northwest aboard a ship specially modified to transport unusually large cargo.

The cranes are the first to come to the port since an August deal with SSA Terminals, under which the company has to buy more of its own cranes in exchange for no longer having to pay the port a fee to maintain and operate port-owned cranes.

Under the agreement, SSA, which operates out of Terminal 18, has to buy more of its own cranes over the next five years. In addition to the three just-arrived cranes, another three are expected to arrive by 2013.

Although the port’s expected lose over $5 million in revenue in the next five years under the deal, it says it will ultimately save at least $232,000, since it won’t have to pay for any of the scheduled crane replacements during that time.